Skip to content

Altered Traffic Patterns Expected in Bochum Starting From Monday

Traffic disruptions scheduled for Monday (11.08.) will impact Bochum residents, specifically on the A40 and Dr.-C.-Otto-Straße.

Alterations in Motorway Usage Starting from Monday in Bochum
Alterations in Motorway Usage Starting from Monday in Bochum

Altered Traffic Patterns Expected in Bochum Starting From Monday

In the upcoming weeks, several changes will affect traffic in Bochum. Starting Monday, the A40 motorway between the Bochum-Harpen and Westkreuz junctions will be completely closed in both directions due to bridge reconstruction work on the Schlachthofbrücke near Bochum. This closure is expected to last for 15 weeks from August 6, 2024[1].

During this period, traffic will be detoured onto the A448 and A43 motorways. For those travelling from Essen to Dortmund, the detour route will be via A448 at Bochum West interchange, then A43 at Bochum/Witten interchange, reconnecting with A40 at Bochum interchange. The route for those travelling from Dortmund to Essen will be reversed accordingly.

Additionally, the Autobahn GmbH Rhineland is renewing the surface layer of the road during this time. The A40 motorway will partially close on Monday, affecting evening rush hour traffic.

Meanwhile, local roads such as Dr.-C.-Otto-Straße, Universitätsstraße, and Hochstraße will also experience some changes. The city of Bochum will be investigating and fixing anomalies in the supply lines that have been discovered.

In Wattenscheid, the Hochstraße renovation is expected to last until August 22nd. Road surface renovation will take place specifically at Hochstraße 26 and Otto-Brenner-Straße. Traffic can pass by the Universitätsstraße median strip area in one lane during the renovation. A one-way street in the direction of August-Bebel-Platz will be set up for the Hochstraße renovation.

Dr.-C.-Otto-Straße in Dahlhausen will temporarily become a one-way street. The street will be closed in the direction of Dahlhausen, from the car repair shop to the branch "Auf dem Holte".

For those using public transportation, changes are expected in buses and trains from Monday due to the village festival in Harpen and Bochum Kulinarisch. An overview of these changes can be found at this link.

The Universitätsstraße median strip renovation is expected to last until August 25th. The city works want to ensure a smooth flow of traffic during these renovations, and a detour will be signposted.

It is advisable for commuters to plan their routes accordingly and expect some delays during this period. For the most updated information on traffic and transportation changes, please visit the official city of Bochum website or your preferred transportation service's website.

[1] Source: Official city of Bochum press release

  1. The closure of the A40 motorway in both directions for 15 weeks due to bridge reconstruction work might affect plans in the finance industry, especially for companies that heavily rely on transportation between Bochum-Harpen and Westkreuz junctions.
  2. With the upcoming changes in traffic, commuters might find alternative routes within the industry more convenient, such as using public transportation services instead, as highlighted in the link provided.

Read also:

    Latest