Partial road closure anticipated on the left-bank avenue
**Headline:** Partial Closure of Turan Avenue in Astana Scheduled for July 7-12, 2025
Starting from July 7 to July 12, 2025, a section of Turan Avenue in Astana will undergo partial and gradual road closures. This is due to the laying of the top asphalt layer as part of repair works[1].
### Traffic Organization
The road will not be fully closed but partially, meaning some lanes will remain open while repairs are underway. Drivers can expect delays and reduced lane availability on this stretch of Turan Avenue during this period.
### Alternative Routes
The announcement does not specify exact alternative routes. However, considering the location (Turan Avenue between Sagynak and Sarayshyk Streets), drivers are advised to use parallel streets or other nearby avenues to bypass the construction zone for smoother travel.
### One-direction Traffic Organization
The one-direction traffic organization on Turan Avenue will be temporary. Vehicle traffic on this section will be organized in only one direction: first from the airport towards the city, then from the city towards the airport[1].
### Pedestrian Considerations
Pedestrians are asked to take into account possible changes when navigating Turan Avenue. The one-direction traffic organization does not affect the scheduled completion date of the road surface work, which is still set for July 12 of this year[1].
### Important Reminders
Motorists are encouraged to plan ahead, allow extra travel time, and stay updated on traffic reports for any changes or additional detours as works progress[1]. Drivers are also advised to take into account possible changes when planning their route on Turan Avenue.
The road surface work in Astana is being conducted by the city administration.
- Despite the road surface work on Turan Avenue in Astana, affecting the automotive industry and public-transit transportation, alternative routes can be found for smoother travel, such as the use of parallel streets or other nearby avenues.
- The finance and industry sectors may be affected during the road surface work on Turan Avenue in Astana, as delays and reduced lane availability are expected from July 7 to July 12, 2025, and the announcement did not specify exact alternative routes for drivers.
- As part of the repair works on Turan Avenue, the automotive industry may experience temporary hindrances, as one-direction traffic organization will be in place on this section from July 7 to July 12, 2025, affecting vehicle navigation and implying changes for pedestrians.